A targeted fix with a written diagnosis. Failed flashing rebuilt, lifted shingles reset, wet decking checked before anything is closed back up.

Service at a glance
Duration
1 day
Dried in
Same day
Warranty
5 years
Estimate
Free
Financing
Available
Book this service

Free inspection first, always. If replacement is not what you need, we will tell you.

Get a free Estimate
Get a free Estimate

Most leaks are nowhere near the stain

Water travels. It enters at a failed flashing joint or under a lifted shingle, runs along the underside of the deck or down a rafter, and finally shows itself on a ceiling two metres from where the problem actually is. That is why every repair starts on the roof and in the attic — never with a tube of sealant and a guess.

Once we know the entry point, we fix the cause rather than the symptom. Sometimes the honest answer is that a repair buys you two more seasons and a replacement is the better spend. We will put that in writing instead of selling you a patch that fails the following winter.

__wf_reserved_inherit

What you actually receive

  • Photographs of the failure point before and after the repair
  • A written diagnosis naming the cause, not only the symptom
  • Matching material where it still exists, and the closest match where it does not
  • Gutters cleared along the work area and a magnet sweep before we leave
__wf_reserved_inherit

Where the price actually moves

The number of leaks matters far less than what is behind them. Access and pitch decide how safely a crew can work. The type of failure decides the fix — a reset shingle and a rebuilt chimney flashing are not the same afternoon. And saturated decking, which nobody can see until the area is opened, is the only real unknown. Our estimate names that contingency up front rather than discovering it halfway through the morning.

__wf_reserved_inherit
Most repairs are finished in a single visit. If we cannot make it watertight that day, we tarp it properly and return — never the other way round.
(Related Services)

Related Our Services

Roof Replacement

We remove worn-out roofing and install a durable new system built to restore protection, improve curb appeal, and keep your home secure for years.

Roof Repair

From leaks and damaged shingles to flashing issues, we provide dependable repairs that address the problem quickly and help prevent further damage.

Storm & Hail Damage

We assess storm and hail damage carefully, then provide targeted repairs to restore your roof and protect your home from future weather.

Roof Inspection

Our detailed inspections uncover signs of wear, leaks, and hidden damage so you can understand your roof’s condition and plan with confidence.

(Asked Questions)

Frequently Asked Questions

Need More Information? Contact Us Below
How long does a roof replacement take?

Most homes are dried in on day one and finished within three. Weather is the only real variable, and we will not open a roof we cannot close again the same day.

Will my insurance cover this?

If the damage is storm or hail related, usually yes. We document the roof the way an adjuster needs to see it, file alongside you, and meet the adjuster on the roof so nothing gets quietly trimmed from the scope.

What if you find rot under the old roof?

Every estimate states a decking allowance up front, so rotten sheathing is priced before we start rather than discovered afterwards. We photograph every board we replace and only charge for what is actually swapped.

Do you offer financing?

Yes. Twelve months interest-free for deductibles and smaller repairs, or terms up to twelve years for full replacements. Approved storm claims usually mean you pay the deductible only and we invoice your insurer directly.

What does the warranty actually cover?

Two warranties, both registered before we leave. The manufacturer covers the materials, and our own workmanship warranty covers the installation itself — including flashing, penetrations and the ventilation work.

Do you work on commercial buildings?

About a third of our work is commercial or multi-family, most of it over occupied buildings. Flat and low-slope membrane, standing-seam metal, phased scheduling and night work where tenants cannot be disturbed.

(Free estimate)

Let’s get up there and have a look

Free inspection, a photographed report, and a fixed quote inside twenty-four hours. No pressure, no call-backs from a sales team.